UKEN

Thank you!

Our manager will contact you as soon as possible

SH-1 ''MASHINNA'' SHUTTLE

Gypsum
description:

SH-1 - a gypsum mixture with fillers and special additives for leveling non-deformation surfaces (brick, concrete, aerated concrete, etc.). For internal work. Designed for both manual and machine application.

features:
  • Machine drawing
  •   Used as a starting putty
  •   With a warming effect
  •   Smooth surface after brushing
order

Usage

SH-1 - a gypsum mixture with fillers and special additives for leveling non-deformation surfaces (brick, concrete, aerated concrete, etc.). For internal work. Designed for both manual and machine application.

preparing basis

The substrate must be strong, even, cleaned of dirt, paint and fragile areas. Surfaces with increased water absorption should be treated with a primer G-1 according to the instructions.

preparing

Gradually pour the mixture into a vessel with a measured amount of pure water while simultaneously manual or mechanical (at low revolutions), stirring until a homogeneous mass is obtained. Stand for 5 minutes and mix again. When machined, the mortar mixture is prepared according to the instructions of the machine.

Technical parameters

Usage guide

  • SUMISH SH-1 G.2. ST1 DSTU B V.2.7-126
    2011
  • Approximate dilution
    from 11 kg / m2 at a thickness of 10 mm
  • Volume of water for mixing
    0,35 - 0,40 l / kg (7,0-8,0 l / bag)
  • Shelf life of the mortar mixture
    not less than 90 minutes.
  • Recommended thickness of one layer
    not more than 20 mm
  • Strength of the clutch with the base
    not less than 0,3 MPa
  • Vapor permeability
    not less than 0.07 mg / m х hour. x pa
  • Performance temperature
    from + 5 ° C to + 30 ° C
  • Guaranteed storage life
    8 months. from the date of manufacture
  • Packaging
    paper bags of 30 kg

Apply the mortar mixture evenly on the wall with a trowel or bucket. When machining, do the work according to the manufacturer's recommendations. The surface is aligned with the rule. After the start of tzhvyvnya (with a slight pressing of a finger remains a small dent, the solution does not remain on the finger), remove the small inequalities, cutting them with a wide spatula. When applying plaster in two layers on the first cut a sharp tool grid depth up to 5 mm for better adhesion of the layers.
After thickening of the plaster (the surface of the moisture, but dents from the finger are not formed), the surface is blurred with a damp sponge and a wide spatula to finish the smoothing. Further work (finishing spalkevlenie, pasting the wallpaper) to conduct after a complete drying of plaster, which under normal conditions is achieved in 2-3 days.
The technical characteristics of the mixture and the recommendations for use were determined under standard conditions (t = 20 ° С, humidity 65%) and in real conditions may vary.
The manufacturer guarantees the conformity of the products with the declared technical characteristics, subject to the rules of transportation, storage and compliance with this instruction.
The manufacturer does not bear responsibility for the unauthorized use of the material.

Download full catalog in PDF format
download