Apply the mortar using a metal grater or poluterker. After leveling the layer to a given grain thickness, create the desired texture of the surface with a plastic grater.
The time until the texture is formed (5-15 min.) Is determined visually: plastic grass press slightly to the surface and inspect - the mortar should not stick to the grinder. The time between the beginning and the end of the invoice is limited and depends on the quality of the preparation of the base, the consistency of the mixture, the temperature of the environment and humidity. At t 20 ° C and 60% humidity is not less than 30 minutes. Do not allow the drying of the edges of the applied mortar mixture - when applying the next strip of plaster joints will be noticeable - to perform work using the wet method wet. Painting can be done with any facade paints no earlier than 3 days after applying plaster.
The technical characteristics of the mixture and the recommendations for use were determined under standard conditions (t = 20 ° С, humidity 65%) and in real conditions may vary.
The manufacturer guarantees the conformity of the products with the declared technical characteristics, subject to the rules of transportation, storage and compliance with this instruction.
The manufacturer does not bear responsibility for the unauthorized use of the material.